Marine Construction Gold Coast & Brisbane

Phone 0412 145 600

Piling, Screw Piers & Anchoring

Piling, Screw Piers & Anchoring

Piling

Enviromarine can undertake numerous marine piling projects for

  • Pontoons
  • Jetties
  • Boardwalks
  • Bridges

Our fleet of barges can accommodate a wide variety of pile and excavator / crane configurations providing for safe and accurate installations to engineering specifications.

Pile Driving / Augering Masts 8.5 metre & 12.5 metre for installation of concrete and steel piles, pontoons and jetties. Rock drilling capacity.

Both Piling Rigs can be mounted to our barges or to our excavators if onshore piling is required.

Hydraulic Pile Shears for removal of steel, concrete and timber piles up to 600 mm diameter above and below water. This unit was designed and built by Envirostruct services and is the only unit available in Australia. Alleviates the requirement for diving teams whilst removing the high risk element of underwater operations. Works are monitored by underwater video cameras in real time.

Enviromarine has substantial experience operating within busy waterways and highly sensitive aquatic habitats. Enviromarine recently drove over 330 timber piles from our mini- barge within the highly sensitive Coombabah Lakelands Conservation Area for a Gold Coast City Council Boardwalk project.

Screw Piers, Drilling & Anchoring

Foundations and retaining are a very critical elements of any structural project where poor bearing soils are present, Enviromarine offer a variety of foundation and retaining options to meet project design and construction requirements.

  • Screw Piers
  • Micro Piling
  • Driven Piling
  • Bored Piling
  • Sheet Piling
  • Water Jetting Piling
  • Soil Nailing
  • Soil & Rock Anchoring
  • Rock Drilling
  • Shotcreting

Enviromarine has extensive experience in the design and construction of foundation and retaining systems for small and large projects. We can offer obligation free practical design advice and cost estimates at the conceptual stage of your project to assist with project planning.